Still not completely done as we need a better way of tracking the routed module being used down in the OOB - e.g., when a peer drops connection, we want to remove that route from all conduits that (a) use the OOB and (b) are routed, but we don't want to remove it from an OFI conduit.
This commit adds support for project_framework_component_* parameter
matching. This is the first step in allowing the same framework name
in multiple projects. This change also bumps the MCA component version
to 2.1.0.
All master frameworks have been updated to use the new component
versioning macro. An mca.h has been added to each project to add a
project specific versioning macro of the form
PROJECT_MCA_VERSION_2_1_0.
Signed-off-by: Nathan Hjelm <hjelmn@me.com>
WHAT: Merge the PMIx branch into the devel repo, creating a new
OPAL “lmix” framework to abstract PMI support for all RTEs.
Replace the ORTE daemon-level collectives with a new PMIx
server and update the ORTE grpcomm framework to support
server-to-server collectives
WHY: We’ve had problems dealing with variations in PMI implementations,
and need to extend the existing PMI definitions to meet exascale
requirements.
WHEN: Mon, Aug 25
WHERE: https://github.com/rhc54/ompi-svn-mirror.git
Several community members have been working on a refactoring of the current PMI support within OMPI. Although the APIs are common, Slurm and Cray implement a different range of capabilities, and package them differently. For example, Cray provides an integrated PMI-1/2 library, while Slurm separates the two and requires the user to specify the one to be used at runtime. In addition, several bugs in the Slurm implementations have caused problems requiring extra coding.
All this has led to a slew of #if’s in the PMI code and bugs when the corner-case logic for one implementation accidentally traps the other. Extending this support to other implementations would have increased this complexity to an unacceptable level.
Accordingly, we have:
* created a new OPAL “pmix” framework to abstract the PMI support, with separate components for Cray, Slurm PMI-1, and Slurm PMI-2 implementations.
* Replaced the current ORTE grpcomm daemon-based collective operation with an integrated PMIx server, and updated the grpcomm APIs to provide more flexible, multi-algorithm support for collective operations. At this time, only the xcast and allgather operations are supported.
* Replaced the current global collective id with a signature based on the names of the participating procs. The allows an unlimited number of collectives to be executed by any group of processes, subject to the requirement that only one collective can be active at a time for a unique combination of procs. Note that a proc can be involved in any number of simultaneous collectives - it is the specific combination of procs that is subject to the constraint
* removed the prior OMPI/OPAL modex code
* added new macros for executing modex send/recv to simplify use of the new APIs. The send macros allow the caller to specify whether or not the BTL supports async modex operations - if so, then the non-blocking “fence” operation is used, if the active PMIx component supports it. Otherwise, the default is a full blocking modex exchange as we currently perform.
* retained the current flag that directs us to use a blocking fence operation, but only to retrieve data upon demand
This commit was SVN r32570.
Roll in the ORTE state machine. Remove last traces of opal_sos. Remove UTK epoch code.
Please see the various emails about the state machine change for details. I'll send something out later with more info on the new arch.
This commit was SVN r26242.
* add hnp and orted modules to the errmgr framework. The HNP module contains much of the code that was in the errmgr base since that code could only be executed by the HNP anyway.
* update the odls to report process states directly into the active errmgr module, thus removing the need to send messages looped back into the odls cmd processor. Let the active errmgr module decide what to do at various states.
* remove the code to track application state progress from the plm_base_launch_support.c code. Update the plm modules to call the errmgr directly when a launch fails.
* update the plm_base_receive.c code to call the errmgr with state updates from remote daemons
* update the routed modules to reflect that process state is updated in the errmgr
* ensure that the orted's open the errmgr and select their appropriate module
* add new pretty-print utilities to print process and job state. Move the pretty-print of time info to a globally-accessible place
* define a global orte_comm function to send messages from orted's to the HNP so that others can overlay the standard RML methods, if desired.
* update the orterun help output to reflect that the "term w/o sync" error message can result from three, not two, scenarios
This commit was SVN r23023.
In case we use memcmp, strlen, strup and friends include <string.h>
Also several constants.h are not included directly
- Let's have mca_topo_base_cart_create return ompi-errors in
ompi/mca/topo/base/topo_base_cart_create.c
This commit was SVN r20773.
1. remove direct routed module (hooray!)
2. add radix tree routed module (binomial remains default)
3. remove duplicate data storage - orteds were storing nidmap and pidmap data in odls, everyone else in ess
4. add ess APIs to update nidmap, add new pidmap - used only by orteds for MPI-2 support
5. modify code to eliminate multiple calls to orte_routed.update_route that recreated info already in ess pidmap. Add ess API to lookup that info instead. Modify routed modules to utilize that capability
6. setup new ability to shutdown orteds without sending back an "ack" message to mpirun - not utilized yet, will require some changes to plm terminate_orteds functions in managed environments (coming soon)
Initial tests indicating that fully routing comm via defined routing trees may not actually have a significant cost for operations like IB QP setup. More tests required to confirm.
This will require an autogen...
This commit was SVN r19866.
Some minor changes to help facilitate debugger support so that both mpirun and yod can operate with it. Still to be completed.
This commit was SVN r18664.
Update the rsh tree spawn capability so we spawn the next wave of daemons before launching our own local procs.
Add an ability to encode nodenames for large clusters with contiguous node name numbering schemes - this allows communication of all node names in a few bytes instead of tens-of-bytes/node.
This commit was SVN r18338.
Basically, the method employed here is to have a recv create a zero-time timer event that causes the event library to execute a function that processes the message once the recv returns. Thus, any action taken as a result of processing the message occur outside of a recv.
Created two new macros to assist:
ORTE_MESSAGE_EVENT: creates the zero-time event, passing info in a new orte_message_event_t object
ORTE_PROGRESSED_WAIT: while waiting for specified conditions, just calls progress so messages can be recv'd.
Also fixed the failed_launch function as we no longer block in the orted callback function. Updated the error messages to reflect revision. No change in API to this function, but PLM "owners" may want to check their internal error messages to avoid duplication and excessive output.
This has been tested on Mac, TM, and SLURM.
This commit was SVN r17647.
* General TCP cleanup for OPAL / ORTE
* Simplifying the OOB by moving much of the logic into the RML
* Allowing the OOB RML component to do routing of messages
* Adding a component framework for handling routing tables
* Moving the xcast functionality from the OOB base to its own framework
Includes merge from tmp/bwb-oob-rml-merge revisions:
r15506, r15507, r15508, r15510, r15511, r15512, r15513
This commit was SVN r15528.
The following SVN revisions from the original message are invalid or
inconsistent and therefore were not cross-referenced:
r15506
r15507
r15508
r15510
r15511
r15512
r15513